One last power option, each parallel steps can be declared as “Must Do”. In our example of Step 2 and step 3, we want both steps to complete before we move to step 4, so we use the “Must Do” check box to let Office Conductor know to wait.
|
|
|
However, if we only need one parallel step to complete before continuing, we leave the “Must Do” check box clear. Steps 5, 6, and 7 are authorization steps in our example. If only one authorization is required, set them in parallel with their “Must Do” boxes clear. Once one person completes their step, step 8 will begin.
Any combination of “Must Do” check boxes can be set. This is a powerful way to control complex flows with one simple option.
|
|